What flows produce low-iron quartz sand (<30ppm Fe₂O₃) for photovoltaic glass?


How to Achieve 94% Copper Recovery in High-Clay Ores?


Gold Concentrators: How Do They Double Recovery Rates in Complex Ores?


HPQ Yes or not?


Special Graphite and Carbon

Special Graphite and Carbon

The demand from the industry over the years has been for special graphite and carbon with increasingly tighter

Gold Flotation Process

Gold Flotation Process

Flotation is the most popular processing way in gold ore processing project. Because the flotation process

Natural Graphite Flotation

Natural Graphite Flotation

There are two types natural graphite ore include crystalline graphite and amorphous graphite

1800TPD Gold Processing EPC Project in Indonesia

1800TPD Gold Processing EPC Project in Indonesia

Raw Ore: Alluvial/Sulfide Type Gold Ore (depending on specific deposit) Gold Grade: 3.5 g/t Gold Recovery Rate: 92%

500 TPD Modular Copper Flotation Plant in Chile

500 TPD Modular Copper Flotation Plant in Chile

Raw Ore: Mixed Oxide-Sulfide Copper Ore (Chalcocite/Malachite) Copper Grade: 1.2% | Silver: 15g/t

2 MTPA Integrated Graphite High-Value Utilization Park Project in China

2 MTPA Integrated Graphite High-Value Utilization Park Project in China

Project Type: World-Class Integrated Graphite Mining & Advanced Materials Industrial Park Raw Material: Natural Flake Graphite Ore Resource

300 TPD Fluorite Ore Dressing Plant

300 TPD Fluorite Ore Dressing Plant

Raw Material: Fluorite Ore (CaF₂) Fluorite Grade: 35-40% Concentrate Grade: ≥97% CaF₂

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

Capacity Target: Increase processing capacity from 500 TPD to 850 TPD in phases without halting production.

Arsenic Removal Pilot Plant for Gold Ores

Arsenic Removal Pilot Plant for Gold Ores

Raw Ore: Gold ore with high arsenic content Gold Grade: 3.5 g/t Arsenic Content: 2.1%

10 tpd Mobile Gold Processing Plant in Laos

10 tpd Mobile Gold Processing Plant in Laos

Features: Compact layout, full process coverage, low investment cost, and fast deployment. Designed for Startups & Small Mines — Your flexible and efficient gold solution!

10000 TPA High-Purity Graphite Plant

10000 TPA High-Purity Graphite Plant

Raw Material: Graphite Flotation Concentrate (95% C) Project Capacity: 10,000 tons per annum

HIMS Magnetic Separator

HIMS Magnetic Separator

Prominer can provide different HIMS (High Intensity Magnetic separator) magnetic separators

Stationary Belt Conveyor

Stationary Belt Conveyor

We can provide the solution of belt conveyors for different purposes include steeply inclined belt conveyor

Carbonization Kiln

Carbonization Kiln

We can provide the complete solution for high temperature carbonization treatment system

Baking Furnace

Baking Furnace

Prominer provides various types of furnaces for primary and secondary baking of carbon

Flotation cell

Flotation cell

Prominer can provide SF series self-priming flotation machine and XCF/KYF series pneumatic flotation cell

Liner Bolt Removal Hammer

Liner Bolt Removal Hammer

We can manufacture the highly automated and powerful recoilless Bolt Hammer to remove

Products

Solutions

Case

contact us

WhatsApp

Contact Form