Why HPGR + Ball Mill Circuits Slash Ilmenite Grinding Costs by 28%?


How Does Oxygen-Rich Flash Flotation Boost Copper Sulfide Concentrate Grades?


How to separate quartz sand by purity grades?


How to Optimize Hematite Recovery Using Advanced Gravity Separation?


Natural Graphite Flotation

Natural Graphite Flotation

There are two types natural graphite ore include crystalline graphite and amorphous graphite

Anode Material Solutions

Anode Material Solutions

Provide the complete solution for making graphite anode materials include grinding, shaping, purification…

Special Graphite and Carbon

Special Graphite and Carbon

The demand from the industry over the years has been for special graphite and carbon with increasingly tighter

2000 TPD Tailings Storage Facility & Dry Stacking System in Peru

2000 TPD Tailings Storage Facility & Dry Stacking System in Peru

Raw Material: Gold mine tailings slurry from CIL plant Tailings Solids Content: 35-40% Final Stacking Density: 1.6-1.8 t/m³

200tph Alluvial Gold EPC processing plant in Zimbabwe

200tph Alluvial Gold EPC processing plant in Zimbabwe

Raw Ore: Alluvial gold ore from river bed Gold Grade: 0.8 g/t

500 TPD Quartz Purification Plant in Southeast Asia

500 TPD Quartz Purification Plant in Southeast Asia

Raw Material: Quartz ore with impurities (Fe, Al, etc.) Quartz Grade: 98.5% SiO₂ Final Product: High-purity quartz sand (99.9% SiO₂)

10000 TPA Spherical Graphite Plant in China

10000 TPA Spherical Graphite Plant in China

Raw Material: High-Purity Graphite (99.95% C) Project Capacity: 10,000 tons per annum

1500 TPD Gold Flotation Plant in Bogutu

1500 TPD Gold Flotation Plant in Bogutu

Raw Ore: Sulfide Type Gold Ore (with associated Pyrite and Arsenopyrite) Gold Grade: 4.2 g/t

1500 TPD Silver & Polymetallic Flotation Plant in Peru

1500 TPD Silver & Polymetallic Flotation Plant in Peru

Raw Ore: Silver-Polymetallic Sulfide Ore (containing Ag, Pb, Zn) Silver Grade: 180 g/t Lead Grade: 4.2% Zinc Grade: 5.8%

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

Capacity Target: Increase processing capacity from 500 TPD to 850 TPD in phases without halting production.

1800 TPD Gold Processing Plant Expansion in Ghana

1800 TPD Gold Processing Plant Expansion in Ghana

Raw Ore: Sulfide Type Gold Ore Gold Grade: 3.5 g/t Gold Recovery Rate: 92%

Banana Screen

Banana Screen

Banana screen is also well known as constant bed thickness screen. Prominer has the ability to supply dry

Dewatering Filters

Dewatering Filters

Prominer can provide press filter, belt vacuum filter, disk vacuum filter and ceramic filter

Multi-cylinder hydraulic Cone crusher

Multi-cylinder hydraulic Cone crusher

Multi-cylinder hydraulic cone crusher combines crusher speed, eccentricity and cavity profile

Skid Mounted Portable Crusher

Skid Mounted Portable Crusher

Skid mounted Portable Crusher, based on market requirements of easier moving from one site

Roller Mill

Roller Mill

We can provide the roller mill for making ultra-fine powder which is suitable to grind

Single-cylinder hydraulic Cone crusher

Single-cylinder hydraulic Cone crusher

Single-cylinder hydraulic cone crusher have two series based on different cavity, S-cavity is designed

Products

Solutions

Case

contact us

WhatsApp

Contact Form