Silicon based anode is one kind of composite anode material by compounding silicon

/
/
Sulfide vs. Oxide Copper: Which Flowsheet Maximizes Recovery & Minimizes Cyanide Risk?


When designing a flowsheet for copper recovery, the choice between sulfide or oxide copper ores profoundly impacts both recovery efficiency and cyanide risk. Here’s how the two differ:
Sulfide copper ores (e.g., chalcopyrite, bornite) are processed primarily using flotation techniques. Sulfide ores generally exhibit higher recoveries in traditional mineral processing due to their strong response to flotation reagents. Cyanide is often not required in sulfide copper flowsheets, minimizing associated risks.
Oxide copper ores (e.g., cuprite, malachite) are typically processed via hydrometallurgical techniques like heap leaching, using sulfuric acid instead of cyanide. Cyanide may appear in secondary gold recovery circuits if gold is associated with the copper oxide ore, increasing cyanide risk.
Ultimately, sulfide ores are preferred for maximizing copper recovery while avoiding cyanide handling risks, provided the processing infrastructure is available. If infrastructure or ore type constraints exist, oxide flowsheets can still be viable but at reduced recovery efficiencies.
A: Mineral characteristics vary significantly even within the same ore body. A professional test (such as chemical analysis, XRD, and SEM) ensures the flowchart is optimized for your specific ore grade and liberation size. This prevents costly equipment mismatches and guarantees the highest possible recovery rates for your project.
A: We maintain a permanent stock of core wear parts (such as crusher liners, screen meshes, and grinding media). For international clients, we provide a recommended “2-year spare parts list” with the initial purchase. Technical support is available 24/7 via remote video, and site visits can be arranged for complex maintenance needs.
A: Yes. We send a team of senior mechanical and electrical engineers to the site to oversee the installation, commissioning, and load testing of the equipment. We also provide comprehensive on-site training for your local operators to ensure smooth long-term operation.
A: Absolutely. We specialize in providing EPCM (Engineering, Procurement, Construction Management) services. This includes everything from initial ore testing and mine design to equipment manufacturing, logistics, and full-scale plant integration, ensuring a seamless transition from greenfield to production.


To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.