The recovery of antimony from complex sulfides, particularly stibnite (Sb₂S₃), requires carefully designed processes to maximize yield due to its association with other sulfide minerals. Depending on the mineralogical characteristics, geochemistry, and complexity of the ore, several processes may be employed. Among them, the hydrometallurgical process and pyrometallurgical techniques are widely used, and flotation methods are often employed as a preparatory step. Here are the key processes to maximize stibnite recovery:
For complex sulfide ores containing multiple metals, strategic combinations of flotation, hydrometallurgy, and pyrometallurgy can be applied to maximize antimony recovery. Sequential processing isolates stibnite selectively while addressing difficulties posed by impurities.
For maximizing antimony recovery, a testwork program tailored to the specifics of the ore should be conducted to determine the optimal combination of these processes. Advances in beneficiation and green chemistry also continue to improve recovery rates.
A: Mineral characteristics vary significantly even within the same ore body. A professional test (such as chemical analysis, XRD, and SEM) ensures the flowchart is optimized for your specific ore grade and liberation size. This prevents costly equipment mismatches and guarantees the highest possible recovery rates for your project.
A: We maintain a permanent stock of core wear parts (such as crusher liners, screen meshes, and grinding media). For international clients, we provide a recommended “2-year spare parts list” with the initial purchase. Technical support is available 24/7 via remote video, and site visits can be arranged for complex maintenance needs.
A: Yes. We send a team of senior mechanical and electrical engineers to the site to oversee the installation, commissioning, and load testing of the equipment. We also provide comprehensive on-site training for your local operators to ensure smooth long-term operation.
A: Absolutely. We specialize in providing EPCM (Engineering, Procurement, Construction Management) services. This includes everything from initial ore testing and mine design to equipment manufacturing, logistics, and full-scale plant integration, ensuring a seamless transition from greenfield to production.


To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.