Photovoltaic glass sand standard


How to Maximize Recovery from Complex Limonite Ores?


Which 4 Metrics Expose Hidden Profit Loss in Your Zn/Pb Circuit?


What Types of Gold Concentrators Are Essential in Modern Processing Plants?


Hard Carbon Anode

Hard Carbon Anode

Hard carbon anode material is the most preferred materials for commercialization of sodium-ion battery

Gold Vat Leaching

Gold Vat Leaching

Vat leaching is a good option for the project owner to start at initial stage to save investment

Natural Graphite Anode

Natural Graphite Anode

Prominer can provide the complete solution for making natrual graphite anode materials include grinding

300 TPD Fluorite Ore Dressing Plant

300 TPD Fluorite Ore Dressing Plant

Raw Material: Fluorite Ore (CaF₂) Fluorite Grade: 35-40% Concentrate Grade: ≥97% CaF₂

3000 TPD Limestone Processing Plant in Indonesia

3000 TPD Limestone Processing Plant in Indonesia

Raw Material: High-Calcium Limestone Final Product: Cement Raw Material Powder (200 mesh) & Construction Aggregate

1500 TPD Alluvial Gold Processing Plant in Guinea

1500 TPD Alluvial Gold Processing Plant in Guinea

Raw Ore: Alluvial Gold Ore from River Deposits Gold Grade: 0.7 g/t (average) Recovery Rate: 90%

1500 TPD Gold Mine CIL Expansion Project in Malaysia

1500 TPD Gold Mine CIL Expansion Project in Malaysia

Raw Ore: Refractory and Semi-Refractory Sulfide Gold Ore Gold Grade: 2.65 g/t Gold Ingot Purity: ≥95.5%

5000 TPD Mineral Processing Plant in Hot and Rainy Region

5000 TPD Mineral Processing Plant in Hot and Rainy Region

Raw Ore: Copper-Gold Ore Copper Grade: 1.2% Gold Grade: 1.5 g/t Recovery Rate: Copper 89%, Gold 88%

15000 TPA Anode Material & 20 TPA Graphene Production Line

15000 TPA Anode Material & 20 TPA Graphene Production Line

Raw Material: Spherical Graphite, Pitch Binder, Additives Project Capacity: 5,000 tons anode material; 20 tons graphene per annum

1500 TPD Gold CIL Plant in Sudan

1500 TPD Gold CIL Plant in Sudan

Raw Ore: Oxide Type Gold Ore Gold Grade: 6-10 g/t

1800 TPD Gold Processing Plant Expansion in Ghana

1800 TPD Gold Processing Plant Expansion in Ghana

Raw Ore: Sulfide Type Gold Ore Gold Grade: 3.5 g/t Gold Recovery Rate: 92%

Carbonization Kiln

Carbonization Kiln

We can provide the complete solution for high temperature carbonization treatment system

Granulation Reactor

Granulation Reactor

Our granulation reactor combines the coating and granulation processing functions together

Flip Flow Screen

Flip Flow Screen

Flip-flow screen panel continues expanding and contracting so achieve a high acceleration rates

Banana Screen

Banana Screen

Banana screen is also well known as constant bed thickness screen. Prominer has the ability to supply dry

Baking Furnace

Baking Furnace

Prominer provides various types of furnaces for primary and secondary baking of carbon

Linear Screen

Linear Screen

Prominer can provide all kinds of linear screen for mineral grading, material sizing, dewatering

Products

Solutions

Case

contact us

WhatsApp

Contact Form