How is iron extracted from haematite?


Which Extraction Equipment Best Processes Lead-Zinc Ores?


Prominer attended the Mining Exhibition MiningWrold Russia


What Are the Most Efficient Solutions for Phosphate Hill Mine Processing?


Gold Heap Leaching

Gold Heap Leaching

Heap leaching is a traditional cyanide leaching processing way which is flexible and economic to extract gold

Direct Lithium Extraction (DLE)

Direct Lithium Extraction (DLE)

We can provide direct lithium extraction (DLE) solution to recover the lithium from salt lake brine

Spodumene and Lepidolite Flotation Plant

Spodumene and Lepidolite Flotation Plant

Spodumene and lepidolite are very important lithium bearing minerals and they are very easy to recover

1800 TPD Flexible CIL/CIP Gold Processing Plant

1800 TPD Flexible CIL/CIP Gold Processing Plant

Raw Ore: Transitional & Oxide Gold Ore (with minor sulfides) Feed Gold Grade: 2.5 g/t Final Product: Gold Doré Ingot

1500 TPD Copper Ore Ball Mill Grinding Plant in Chile

1500 TPD Copper Ore Ball Mill Grinding Plant in Chile

Raw Ore: Copper Ore (Chalcopyrite) Copper Grade: 0.85% Final Products: Grinded ore slurry for flotation

500 TPD Quartz Purification Plant in Southeast Asia

500 TPD Quartz Purification Plant in Southeast Asia

Raw Material: Quartz ore with impurities (Fe, Al, etc.) Quartz Grade: 98.5% SiO₂ Final Product: High-purity quartz sand (99.9% SiO₂)

Upgraded South African Chrome Processing Plant from Gravity to High-Intensity Magnetic Separation

Upgraded South African Chrome Processing Plant from Gravity to High-Intensity Magnetic Separation

Raw Ore: South African Chrome Ore Original Cr₂O₃ Grade: 38% Upgraded Concentrate Grade: 46%

1800 TPD Gold Extraction (CIL) Plant in Burkina Faso

1800 TPD Gold Extraction (CIL) Plant in Burkina Faso

Raw Ore: Weathered Oxide Gold Ore Gold Grade: 1.8 g/t Gold Recovery Rate: 90.5%

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

Capacity Target: Increase processing capacity from 500 TPD to 850 TPD in phases without halting production.

500TPH Iron Ore Beneficiation Plant in South Africa

500TPH Iron Ore Beneficiation Plant in South Africa

Raw Ore: Magnetite Iron Ore with Hematite Banding Fe Grade: 28-32% Final Product: High-Grade Iron Concentrate

2500TPD Lithium Ore Flotation in Sichuan

2500TPD Lithium Ore Flotation in Sichuan

Raw Ore: Lithium Ore Spodumene Li2O Grade: 1.22%

Dewatering Filters

Dewatering Filters

Prominer can provide press filter, belt vacuum filter, disk vacuum filter and ceramic filter

HIMS Magnetic Separator

HIMS Magnetic Separator

Prominer can provide different HIMS (High Intensity Magnetic separator) magnetic separators

Single-cylinder hydraulic Cone crusher

Single-cylinder hydraulic Cone crusher

Single-cylinder hydraulic cone crusher have two series based on different cavity, S-cavity is designed

Mobile Stacker and Unloader

Mobile Stacker and Unloader

Our engineer team can design and manufacture the mobile type radial stacker, loader

SAG/AG Mill,Semi-Autogenous Grinding Mill for Sale

SAG/AG Mill,Semi-Autogenous Grinding Mill for Sale

AG/SAG is short for autogenous mill and semi-autogenous mill, it combines with two functions of crushing

Gold Refinery and Smelting System

Gold Refinery and Smelting System

Prominer can design and provide the complete refinery and smelting system for gold CIL project

Products

Solutions

Case

contact us

WhatsApp

Contact Form