/

/

Flip Flow Screen

Application

Feature

Services

Project Cases

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

500 to 850 TPD Cu-Pb-Zn Polymetallic Ore Processing Plant Capacity Expansion Without Production Stoppage

Capacity Target: Increase processing capacity from 500 TPD to 850 TPD in phases without halting production.

Ghana 500 TPD Gold Tailings CIL Processing Project

Ghana 500 TPD Gold Tailings CIL Processing Project

Feed Material: Historically Stockpiled Gold Tailings Tailings Gold Grade: 1.5 g/t Target Gold Recovery Rate: 88%

500 TPD Copper Flotation Optimization & Slurry Flow Regulation Project

500 TPD Copper Flotation Optimization & Slurry Flow Regulation Project

Raw Ore: Sulfide Copper Ore Copper Grade: 1.2% Target Flotation Recovery Rate: 92%

1500 TPD Molybdenum Flotation Plant in China

1500 TPD Molybdenum Flotation Plant in China

Raw Ore: Sulfide-Type Molybdenum Ore (Molybdenite) Head Grade: 0.15% Mo Concentrate Grade: ≥ 55% Mo

800 TPD Tailings All-Slime Cyanidation CIL Plant in Ghana

800 TPD Tailings All-Slime Cyanidation CIL Plant in Ghana

Raw Material: Existing gold plant tailings (All-slime) Gold Grade in Tailings: 1.2 g/t Final Product: Gold Ingot

Products

Solutions

Case

contact us

WhatsApp

Contact Form