/

/

LIMS Magnetic Separator

Application

Feature

Services

Project Cases

1500 TPD Molybdenum Flotation Plant in China

1500 TPD Molybdenum Flotation Plant in China

Raw Ore: Sulfide-Type Molybdenum Ore (Molybdenite) Head Grade: 0.15% Mo Concentrate Grade: ≥ 55% Mo

800 TPD Tailings All-Slime Cyanidation CIL Plant in Ghana

800 TPD Tailings All-Slime Cyanidation CIL Plant in Ghana

Raw Material: Existing gold plant tailings (All-slime) Gold Grade in Tailings: 1.2 g/t Final Product: Gold Ingot

2,000 TPD Copper Ore Beneficiation Plant in Kazakhstan

2,000 TPD Copper Ore Beneficiation Plant in Kazakhstan

Raw Ore: Sulfide Type Copper Ore (Mainly Chalcopyrite) Copper Grade: 0.8% Final Product: Copper Concentrate

2000 TPD Tailings Storage Facility & Dry Stacking System in Peru

2000 TPD Tailings Storage Facility & Dry Stacking System in Peru

Raw Material: Gold mine tailings slurry from CIL plant Tailings Solids Content: 35-40% Final Stacking Density: 1.6-1.8 t/m³

200 TPD Gold Extraction Solution Regeneration Plant in Yemen

200 TPD Gold Extraction Solution Regeneration Plant in Yemen

Raw Material: Spent gold leaching solution (cyanide-based) Gold Concentration in Solution 2-5 ppm

Products

Solutions

Case

contact us

WhatsApp

Contact Form