
Raw Ore: Crystalline Flake Graphite Ore
Feed Carbon Grade: 8–12% (Variable)
Final Product: High-Purity Flake Graphite Concentrate
Target Concentrate Grade: ≥ 96% Cg
Target Recovery Rate: ≥ 92%
Capacity: 1,000 tons per day (Scalable Pilot Setup)
Work Scope: Ore Characterisation & Process Testwork, Complete Modular Equipment Supply, Installation Guidance & Performance Guarantee Test
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Ore Crushing & Coarse Sorting:

Flake Protection & Classification:

Concentrate Dewatering & Drying:

Modular & Containerised Design: Major equipment pre-assembled in container modules for rapid deployment and commissioning in remote Tanzanian sites.

Flexible & Data-Rich Pilot Circuit: The plant is fully instrumented for variabile ore tests, providing accurate scale-up data for a future 5,000–10,000 TPD commercial plant.

Water-Efficient & Dry Stack Tailings: Tailings are fully dewatered for safe dry stacking, minimising environmental footprint and water consumption—critical for water-sensitive regions.

Grinding & Liberation:

Multi-Stage Flotation:

Tailings & Water Management:

High-Efficiency Flotation with Smart Control: Automated reagent dosing and air flow control based on real-time pulp density and grade analysis.

Flake Graphite Protection Technology: Integrated low-energy grinding and classification system to maximize +100 mesh large flake yield, enhancing product value.
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.