Project Background: Expansion and Technological Upgrade of an Existing Flotation Plant
Raw Ore: Refractory Sulfide Gold Ore with associated pyrite and arsenopyrite
Original Plant Capacity: 1.2 Million t/a
Final Product: Gold Flotation Concentrate
Expanded Capacity: 2.0 Million t/a (Total)
Gold Recovery Rate: Increased from 86% to 92.5% post-expansion
Work Scope: EPC – Expansion Design, New Equipment Supply, Installation, Integration & Commissioning
Here are some photos of the project, click on the small picture to view the large picture.







Below are some ways to handle this plan. If you want to get a more detailed plan, please click the button to contact us.


Upgraded Crushing & Screening:

Enhanced Flotation Circuit:

Process Control & Automation:

Grinding Circuit Expansion:

Concentrate & Tailing Handling:
Key Features & Outcomes of the Expansion:
To find out more about our products and solutions, please fll out the form below and one of our experts will get back to you shortly
3000 TPD Gold Flotation Project in Shandong Province
2500TPD Lithium Ore Flotation in Sichuan
Fax: (+86) 021-60870195
Address: No.2555,Xiupu Road, Pudong, Shanghai
Copyright © 2023. Prominer (Shanghai) Mining Technology Co.,Ltd.